6 Stages of Building A Swimming Pool | Here’s How Long It Takes To Build A Pool!

February 15, 2023
182 Views

When the summer heat gets too much to bear, a quick dip in the swimming pool is all it takes to recharge yourself. Truly, there is nothing as refreshing as being able to cool down right in your backyard.

But what if you don’t have a swimming pool? Can you get it built from the ground up? How long does it take to build a pool?

If your curiosity is getting the best of you, don’t worry! We’ve listed the entire process of building a pool right here in this blog. This way, you can estimate the best time for a backyard pool renovation.

How Long Does It Take To Build A Pool?

It can take as long as 8 to 12 weeks to build a swimming pool from scratch. The total time depends entirely on the size, design, and material you selected. Sometimes the location and weather conditions can also impact how long it takes to build a pool. Not to mention getting the right permits, scheduling inspections, etc., all need to be covered before the end. So, on average, 12 weeks is the longest it takes to finalize a swimming pool. However, it’s best to consult with a pool contractor for a more accurate estimate of your project.

Swimming Pool Construction Timeline: The Full Process

If you’ve made your decision and are ready to dive into your pool project — pun intended — make sure to keep an eye on the following stages.

  • Stage 1: Selecting The Design
    Depending on the size of your backyard, you can opt for any design you like. However, this initial step can take 1 to 4 weeks to finalize since the designers will have to run it by the architectural team. This involves a lot of back and forth of ideas to get the perfect end result.
  • Stage 2: Acquiring Legal Permits
    In order to ensure you don’t get in trouble with the state, getting a permit is necessary. Depending on your state’s laws, a legal license shows the officials that your in-ground pool was built by professionals and that all safety measures were followed. Typically, pool contractors get the permit themselves. But the process can take weeks, based on how your state or country handles the procedure.
  • Stage 3: Excavation
    The digging or excavating stage doesn’t take nearly as long as the others. Usually, a day or two is all that is needed. However, it is best to allow it a few extra days, just in case.
  • Stage 4: Steel, Plumbing & Electrical Installation
    Once the pool is dug out in your backyard, it can take a week or two to construct the inner structure. This includes laying the steel base and connecting it to other plumbing and electrical outlets.
  • Stage 5: Structural Layering
    This is when important work starts to take place. That is to say; in this phase, the pool builders will install the material you selected. Be it concrete, vinyl, or fiberglass, depending on your choice; it can take time for the top layer to cure and set.
  • Stage 6: Adding Finishing Touches
    Finally, once everything is in place and installed, you can go ahead and jazz up your pool. Whether it’s adding a swim-up pool bar or a separate seating island, the world is your oyster!

Long Story Short

If you’re ready to build your personal oasis in the backyard, look no further! Boutros Construction is here to help bring your dreams to life. Our expert contractors will do everything it takes to transform your backyard, no matter how long it takes to build a pool.

So, what are you waiting for? Reach out to us today at (713) 587 0000. You can even drop by for a visit if you have more questions at 8831 Long Point Rd #102 | Houston, TX 77055.